Move from lagging-indicator reporting to a leading-indicator operating system — pre-task plans, observation cadence, and SIF precursor elimination.
Move from lagging-indicator reporting to a leading-indicator operating system — pre-task plans, observation cadence, and SIF precursor elimination.
Pre-Task Plan Compliance from 62 to 100 (weekly). TRIR (Total Recordable Rate) from 1.9 to ≤ 0.8 (monthly). DART Rate from 1.1 to ≤ 0.4 (monthly).
12 weeks.
Integrates with Procore Safety, SafetyCulture (iAuditor), HammerTech, Power BI through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
OSHA 29 CFR 1926; OSHA Focus Four (Falls, Struck-By, Caught-In, Electrocution); Owner-controlled insurance program (OCIP) requirements All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.