Construction · Schedule Recovery & Pull-Plan

When the CPM slips, recover with field-led pull-plans, a clean 6-week look-ahead, and a constraints-log discipline that out-paces the daily drag.

Frequently asked questions

What does the Construction · Schedule Recovery & Pull-Plan blueprint do?

When the CPM slips, recover with field-led pull-plans, a clean 6-week look-ahead, and a constraints-log discipline that out-paces the daily drag.

What KPIs does the Construction blueprint target?

Milestone Hit-Rate from 55 to ≥ 90 (weekly). Promise Variance (PPC) from 48 to ≥ 80 (weekly). Trade-Stack Conflicts from 11 to ≤ 2 (weekly).

How long does the Construction · Schedule Recovery & Pull-Plan deployment take?

12 weeks.

What systems does the Construction blueprint integrate with?

Integrates with Primavera P6, MS Project, Procore, Touchplan / vPlanner (Last Planner), Power BI through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.

What regulatory requirements does this blueprint address?

AIA G701 / G714 change documentation; Owner-contract liquidated-damages language All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.