Manufacturing · SMED Changeover Reduction

Recover lost capacity from long changeovers, enabling smaller economic batch sizes and faster response to demand.

Frequently asked questions

What does the Manufacturing · SMED Changeover Reduction blueprint do?

Recover lost capacity from long changeovers, enabling smaller economic batch sizes and faster response to demand.

What KPIs does the Manufacturing blueprint target?

External Changeover Time from 12 to ≥ 50 (weekly). Avg Changeover Time (top-3) from 47 to ≤ 10 (weekly). Adjustment Time from 9 to ≤ 1 (weekly).

How long does the Manufacturing · SMED Changeover Reduction deployment take?

10 weeks.

What systems does the Manufacturing blueprint integrate with?

Integrates with MES (changeover state tracking), Video time-study tool, CMMS (tooling availability) through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.

What regulatory requirements does this blueprint address?

No specific regulatory requirements declared. All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.