Manufacturing · Plant OEE Uplift

Recover capacity, output, and margin from the Six Big Losses on the most-loaded line — proven first, then scaled.

Frequently asked questions

What does the Manufacturing · Plant OEE Uplift blueprint do?

Recover capacity, output, and margin from the Six Big Losses on the most-loaded line — proven first, then scaled.

What KPIs does the Manufacturing blueprint target?

Unplanned Downtime from 14 to ≤ 5 (daily). MTBF (constraint asset) from 48 to ≥ 120 (weekly). MTTR from 62 to ≤ 25 (daily).

How long does the Manufacturing · Plant OEE Uplift deployment take?

12 weeks.

What systems does the Manufacturing blueprint integrate with?

Integrates with MES (Wonderware / Ignition / Tulip), Historian (PI / Aveva), CMMS (Maximo / Fiix) through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.

What regulatory requirements does this blueprint address?

OSHA 1910 (machine guarding implications of any speed change); ISO 9001:2015 (process performance evidence) All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.