Eliminate past-due inspections, classify critical equipment under RBI, and tie integrity findings into the maintenance backlog.
Eliminate past-due inspections, classify critical equipment under RBI, and tie integrity findings into the maintenance backlog.
Past-Due Inspections from 62 to 0 (weekly). Inspection On-Time from 73 to ≥ 95 (monthly). RBI Coverage (T1/T2) from 44 to 100 (monthly).
12 weeks.
Integrates with RBI tool (PCMS / Visions), CMMS (Maximo / SAP PM), NDT data hub through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
API 510/570/653 (pressure vessels, piping, tanks); ASME B31 codes All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.