Survey every applicable component on schedule, route every leak to a tracked repair queue, and verify by re-survey.
Survey every applicable component on schedule, route every leak to a tracked repair queue, and verify by re-survey.
LDAR Coverage from 78 to 100 (monthly). Past-Due Surveys from 14 to 0 (weekly). Median Repair Lag from 62 to ≤ 30 (monthly).
10 weeks.
Integrates with OGI camera fleet, LDAR tracking software (Atmos / FieldEdge), Aerial / satellite leak surveys through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
EPA OOOOa/b/c; EPA Subpart W reporting; Methane fee (IRA Sec 60113) All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.