Replace paper permits with an electronic system that enforces isolations, gas tests, and signoffs in real time across all sites.
Replace paper permits with an electronic system that enforces isolations, gas tests, and signoffs in real time across all sites.
ePTW Adoption (Site 1) from 0 to 100 (weekly). Permit Issue Cycle Time from 55 to ≤ 20 (weekly). Sites Live from 0 to 100 (weekly).
12 weeks.
Integrates with ePTW (Sphera / Enablon / Intelex), Gas detector docking, Mobile devices for the field through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
OSHA 1910.147 LOTO; OSHA 1910.146 Confined Space; API RP 2201 Hot Tap All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.