Lock scope at T-90, commit materials at T-60, mobilize at T-30, so the TA window executes without scope creep or schedule slip.
Lock scope at T-90, commit materials at T-60, mobilize at T-30, so the TA window executes without scope creep or schedule slip.
Post-Freeze Scope Adds from 18 to ≤ 5 (weekly). Long-Lead Kitting from 76 to 100 (weekly). Stock-Out During TA from 9 to 0 (monthly).
12 weeks.
Integrates with TA scheduling (Primavera P6), CMMS work-list export, Procurement (SAP MM / Ariba) through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
API RP 754 PSE during TA windows; Local emissions permit conditions during shutdown/startup All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.