Lift production availability of the producing well portfolio while bringing recordable HSE events to zero through predictive maintenance and a disciplined permit-to-work culture.
Lift production availability of the producing well portfolio while bringing recordable HSE events to zero through predictive maintenance and a disciplined permit-to-work culture.
Unplanned Downtime from 125 to ≤ 80 (monthly). Mean Time Between Failures (Tier-1) from 510 to ≥ 720 (monthly). RCA Cycle Time from 27 to ≤ 14 (monthly).
12 weeks.
Integrates with SCADA Historian (PI/Aveva), CMMS (Maximo/SAP PM), ePTW, Slack through the AEROSS Execution Mesh. All writes are credit-metered, CAPS-gated, and audit-stamped.
API RP 754 process safety indicators; OSHA 1910.119 PSM elements; Local environmental discharge permits All agent actions inherit AEROSS CAPS governance — autonomy ceilings, human approval gates, and a tamper-evident audit log.